Sunbury Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Bored pier inspection in Sunbury

Some Sunbury lots on sloping or variable ground need bored piers before the slab, and the engineering sets their depth and size.

  • Once piers are bored and cages placed, before concrete
  • About 1 hour on site
  • Report within 24 hours
Request a quoteTell us the job and we will call you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage1 of 7
When to bookOnce piers are bored and cages placed, before concrete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Sunbury bored piers inspection

  • Pier positions and spacing against the footing plan
  • Pier diameter checked at the top of each hole
  • Depth against the engineer's design and the soil report
  • Founding material at the base where visible
  • Reinforcement cage size, laps and starter bars
  • Cover to the cage and centralisers
  • Hole cleanliness, spoil and loose material
  • Standing water or seepage before the pour
  • Steel projection into the slab or beam
  • Termite and service penetrations near piers
  • Set-out against the site plan and boundaries
  • Records and photographs for the engineer where required
Why it matters here

Bored piers inspections on Sunbury builds

Sunbury sits where volcanic basalt meets older sediments along the Jacksons Creek valley, so ground conditions can change across a short distance. When your engineer specifies piers, the only chance to confirm depth and steel is before the concrete goes in.

What we find at this stage in Sunbury

  • Pier depth short of the engineering
  • Cages sitting against the side of the hole
  • Water or loose spoil at the base
  • Cover to the steel not maintained
  • Pier positions off the setout

The other stages of a Sunbury build

  1. Slab pre-pour inspection in Sunbury2Slab pre-pourThe day before concrete, with steel and pods exposed
  2. Frame inspection in Sunbury3FrameWith frame and trusses up and the roof on, before wrap and cladding
  3. Lock-up (pre-plaster) inspection in Sunbury4Lock-up (pre-plaster)Roof, windows and outside doors in, before plasterboard
  4. Fixing inspection in Sunbury5FixingDoors, joinery and mouldings fitted, before painting
  5. Waterproofing inspection in Sunbury6WaterproofingMembrane on and cured, before the tiler starts
  6. Pre-handover (PCI) inspection in Sunbury7Pre-handover (PCI)Around a week before the handover date

All construction stage inspections in Sunbury →

Guides

Construction stage guides for Sunbury

All guides →

Book a bored piers inspection in Sunbury

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Sunbury: common questions

Does every Sunbury home need bored piers?

No. Plenty of Sunbury lots go straight to a waffle or raft slab without piers. Piers appear when the engineering calls for them, often on slopes, fill or near trees.

What do you measure?

Depth and diameter against the engineering, the position of each pier, and the cover and centring of the steel cage.

Why does water in the hole matter?

Water and loose spoil at the base can reduce the bearing the pier was designed to achieve, so the engineering usually requires clean, dry bases.

Who signs off the piers?

The building surveyor and often the engineer. Our inspection is independent and for you.

How long does it take?

Usually under an hour, depending on how many piers there are.

Can it be checked after the pour?

Not in any meaningful way. Once the concrete is in, depth and steel are hidden for good.

CallGet a Free Quote