Slab beams narrower than drawn

How loose waffle pods shrink the beams in a Sunbury slab, and how to catch it.

Sunbury 3429 · 2026-03-26

In short: A waffle slab relies on its beams. When pods move before the pour, beams end up narrower than designed and nobody sees it afterwards.

How a waffle slab works

Polystyrene pods form voids, and the concrete between them becomes a grid of beams. The width of those beams is part of the design.

What happened on a Sunbury slab

We measured one internal beam at about 50mm wide where the plans called for 110mm, and found a pod lying loose inside another beam.

Why pods move

They are light and often not fixed down. Wind, foot traffic and steel fixing all push them around.

Other slab items

Mesh touching pipes, vapour barrier draped over the steel and too few bar chairs all appeared on the same jobs.

Written by our local inspection team from work carried out in Sunbury. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More new construction stage inspections guides for Sunbury

All guides →

Book a building inspection in Sunbury

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Sunbury owners ask about this

Can a narrow beam be fixed after the pour?

Not practically. It has to be corrected before the concrete goes in.

How do you measure beam width?

With a tape between pods at several points, compared with the engineering.

Is this common?

Pod movement is one of the items we see most at slab stage in Sunbury.

What should I ask the concreter?

Whether pods are fixed down and spacers placed so beam widths hold during the pour.