Frame inspection in Sunbury

Frame stage is where we compare every tie-down, stud and connection on your Sunbury home with the engineering.

  • With frame and trusses up and the roof on, before wrap and cladding
  • 1 to 2 hours on site
  • Report within 24 hours
Request a quoteTell us the job and we will call you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage3 of 7
When to bookWith frame and trusses up and the roof on, before wrap and cladding
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Sunbury frame inspection

  • Stud, plate, lintel and beam sizes against AS 1684 and the engineer's drawings
  • Wall straightness and plumb, top plate level
  • Floor level across the slab
  • Bracing type, position and fixing against the bracing plan
  • Tie-downs from roof to wall and wall to slab
  • Triple grips, straps and bolt fixings
  • Jack studs, lintels and trimmers over every opening
  • Window sill trimmers for wide openings
  • Roof truss spacing, fixing and girder connections
  • Valley boards, ceiling battens and roof bracing
  • Window and door openings against the plans
  • Wet area framing, noggings and service penetrations
  • Damaged, split, notched or over-drilled members
  • Termite collars and slab penetrations still visible
Why it matters here

Frame inspections on Sunbury builds

The heaviest findings in our Sunbury reports come from frame: lintels over wide openings without their tie-downs, girder trusses resting on one stud, connections built differently from the detail, and roof bracing that stops short of the top plate.

What we find at this stage in Sunbury

  • Lintels missing the tie-downs their span needs
  • Single stud under a girder truss
  • Beam connections not matching the engineering
  • Roof bracing not wrapped under the top plate
  • Top plates joined under a truss load
  • Honeycombing in the slab edge
Honeycombing along the slab edge, voids that can weaken the concrete, found during a frame inspection in Sunbury
Honeycombing along the slab edge, voids that can weaken the concrete
Shorter beam over an opening missing its required tie-down fixing, found during a frame inspection in Sunbury
Shorter beam over an opening missing its required tie-down fixing
Loadbearing top plate broken at a joint right under the truss load, found during a frame inspection in Sunbury
Loadbearing top plate broken at a joint right under the truss load
Bottom plate not yet fixed down to the slab in places, found during a frame inspection in Sunbury
Bottom plate not yet fixed down to the slab in places
Sample findings

Sample defects found during our frame inspections in Sunbury

Annotated findings from Frame inspections.

Long lintel over a wide opening without the tie-down its span requires, found during a frame inspection in Sunbury
Long lintel over a wide opening without the tie-down its span requires
Single stud carrying a girder truss where a doubled stud is needed, found during a frame inspection in Sunbury
Single stud carrying a girder truss where a doubled stud is needed
Beam connection built differently from the detail on the engineering, found during a frame inspection in Sunbury
Beam connection built differently from the detail on the engineering
Roof bracing strap stopping short instead of wrapping under the top plate, found during a frame inspection in Sunbury
Roof bracing strap stopping short instead of wrapping under the top plate

The other stages of a Sunbury build

  1. Bored piers inspection in Sunbury1Bored piersOnce piers are bored and cages placed, before concrete
  2. Slab pre-pour inspection in Sunbury2Slab pre-pourThe day before concrete, with steel and pods exposed
  3. Lock-up (pre-plaster) inspection in Sunbury4Lock-up (pre-plaster)Roof, windows and outside doors in, before plasterboard
  4. Fixing inspection in Sunbury5FixingDoors, joinery and mouldings fitted, before painting
  5. Waterproofing inspection in Sunbury6WaterproofingMembrane on and cured, before the tiler starts
  6. Pre-handover (PCI) inspection in Sunbury7Pre-handover (PCI)Around a week before the handover date

All construction stage inspections in Sunbury →

Guides

Construction stage guides for Sunbury

All guides →

Book a frame inspection in Sunbury

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Sunbury: common questions

What is a tie-down and why does it matter?

It is the strap, bolt or rod that holds the frame down against wind uplift. Lintels and beams over openings have their own tie-down requirements that change with span.

Why does a girder truss need a doubled stud?

A girder carries the load of several other trusses. That concentrated load needs two or more studs, or whatever the engineering specifies, to reach the slab.

Is honeycombing in the slab edge serious?

It can be. Voids along the edge may reduce strength and protection to the steel, so it is recorded as a major item for the builder to assess and repair.

Do exposed Sunbury blocks change anything?

The wind classification for your lot sets the bracing and tie-down design. We read it from your engineering rather than assuming one for the suburb.

Which standards apply?

AS 1684 for timber framing and AS 4055 for wind loads, alongside your engineering and the truss layout.

Can a missing tie-down be added later?

Easily before wrap and cladding. Once linings are on, it means removing them.